⬇️ List of works for spring/summer 2024 ⬇️

  • June 11 to 14 : campaign road markings all week long

 

  • Wednesday, June 12 : laid asphalt at these locations: in front of the CHO, Joseray bridge junction, Pistes traffic circle

 

  • Thursday June 13 : laid asphalt rue de la Poste and avenue du Prariond

 

  • Monday, June 17 at 2 p.m. to Saturday, June 22 at 9 a.m. : works cable car tunnel closed to traffic for road repairs and safety work. A detour will be set up. Uphill: to Joseray, Manchet and Legettaz via rue du Picheru, rue de la Face, Joseray crossroads. Return to resort center: via the pistes traffic circle, chemin du Charvet, rue des Leissières, UCPA exit.

 

  • June 17 to November 4 : work on the Saut tunnel. An alternating road system will be in place, day and night, from June 17 to November 4.

1 / Segmented tunnel closure between 10 p.m. and 6 a.m. every hour (e.g.: open from 11pm to 11:05pm) dates: 06/17 to 06/22, 08/30 and 04/11

2 / Complete closure of the tunnel at night, from 10 p.m. to 6 a.m. dates: 06/24 to 06/29

ℹ️ For more information and to be informed of night-time closures by SMS, register by scanning the QR code in the document HERE.

  • Monday 24 to Wednesday 26 : crane assembly le Parc worksite. Downbound lane closed between Moufflier traffic circle and Pétri traffic circle. Detour via l'Ormelune, entrance to center parking lot, Christiania, rue du Coin, Pétri traffic circle.

 